Lake Aldwell behind Elwha Dam begins its descent

PORT ANGELES — The surface level of Lake Aldwell is no longer being manipulated by man.

The U.S. Bureau of Reclamation on Wednesday ceased management of the draw on the reservoir west of Port Angeles, Olympic National Park spokesman Dave Reynolds said.

“Everything is dependent on flow right now,” Reynolds said.

Water in the reservoir has dropped 18 feet since June 1, when the generators inside the Elwha Dam were turned off after 98 years of steadfast service.

Beginning in September, the 108-foot-tall Elwha Dam and the 210-foot Glines Canyon Dam eight miles upstream will be dismantled in the National Park Service’s landmark restoration of the Elwha River’s rich salmon run. It is a three-year, $327 million project and the largest of its kind in U.S. history.

Both dams were rendered useless June 1 when power generation to the Bonneville Power Administration grid ended for good.

“The generators shutting down was a huge milestone for reclamation, of course, and also for the process of the entire project,” Reynolds said. “There’s new milestones every day.”

After generation stopped, the Bureau of Reclamation drew down the water in Lake Aldwell until it reached the bottom of the spillway.

The reservoir was lowered to give the water a place to go, Reynolds said. The penstocks, or intakes that guide torrents water into the turbines, are now closed.

“The reason to do it earlier rather than later is without power generation, we have less water going through the dam,” Reynolds said.

The area just upstream from the Elwha Dam looks vastly different. Hugh blocks of once-submerged concrete are now exposed.

“It’s pretty dramatic,” Reynolds said.

The Bureau of Reclamation is removing hazardous fluids from machinery inside the antiquated powerhouse.

Barnard Construction Co. of Bozeman, Mont., will begin tearing down the dams Sept. 17, a contract with the National Park Service worth $26.9 million. The contractor will begin staging near Lower Dam Road just beyond the Elwha RV Park on July 5, at which time public access will be closed.

Real estate entrepreneur Thomas Aldwell built the Elwha Dam in 1913 to supply electricity to Port Angeles, Port Townsend, Poulsbo and the Navy shipyard in Bremerton.

The Glines Canyon Dam and hydropower project was built in 1927.

________

Reporter Rob Ollikainen can be reached at 360-417-3537 or at rob.ollikainen@peninsuladailynews.com

More in News

Traffic makes it way through curves just east of Del Guzzi Drive on U.S. Highway 101 at the site of a fish barrier project conducted by the state Department of Transportation. Construction is on hiatus for the winter and is expected to resume in March, WSDOT said. The traffic pattern is expected to be in place until this summer. (Dave Logan/for Peninsula Daily News)
Construction on hold

Traffic makes it way through curves just east of Del Guzzi Drive… Continue reading

An Olympic marmot near Cedar Lake in the Olympic National Park. (Matt Duchow)
Olympic marmots under review

Fish and Wildlife considering listing them as endangered

EYE ON THE PENINSULA: Clallam board to consider monument to Owens

Meetings across the North Olympic Peninsula

The Michael Trebert Chapter of the Daughters of the American Revolution, assisted by Trail Life USA and Heritage Girls, retired 1,900 U.S. flags and 1,360 veterans wreaths during a recent ceremony. The annual event also involved members of Carlsborg Veterans of Foreign Wars Post #6787, Sequim American Legion Post 62, Port Angeles Elks Lodge #353 Riders and more than 100 members of the public.
Flag retirement

The Michael Trebert Chapter of the Daughters of the American Revolution, assisted… Continue reading

Rodeo arena to get upgrade

Cattle chutes, lighting expected to be replaced

Jefferson County Commissioner Heather Dudley Nollette works to complete the Point In Time Count form with an unsheltered Port Townsend man on Thursday. (Elijah Sussman/Peninsula Daily News)
Homeless count provides snapshot for needs of unsheltered people

Jefferson County undergoes weeklong documentation period

Aiden Hamilton.
Teenager plans to run for state House seat

Aiden Hamilton to run for Rep. Tharinger’s position

Anthony DeLeon, left, and McKenzie Koljonen, who are planning a wedding in October, practice feeding each other a piece of wedding cake during the Olympic Peninsula Wedding Expo at Field Arts & Events Hall while Selena Veach of Aunt Selena’s Bakery of Port Angeles watches with glee. More than 35 vendors presented all aspects of the wedding experience last weekend. (Dave Logan/for Peninsula Daily News)
Cake rehearsal

Anthony DeLeon, left, and McKenzie Koljonen, who are planning a wedding in… Continue reading

US House passes funds for Peninsula

Legislation still needs support in US Senate

State agency balancing land management, safety

Promised funding in recent budgets falling short

Department of Natural Resources’ plan aims to uphold forest health

Agency attempting to balance conservation, socioeconomic consideration

Jefferson County seeking proposals for opioid settlement funding

The Jefferson County Behavioral Health Advisory Committee is requesting… Continue reading