Feasibility study looks at estimated $58.4 million proposal for Duckabush River project

()

()

BRINNON — A feasibility study is underway on an estimated $58.4 million project to restore portions of the Duckabush River and minimize flooding.

Jefferson County commissioners heard on Monday a presentation by Seth Elsen, a representative of the Hood Canal Salmon Enhancement Group, about a proposal to remove the current U.S. Highway 101 causeway and construct a new 1,100 foot bridge farther upstream from the current highway that would be less susceptible to flooding.

The project — which would be in a 38-acre area — would include the realignment of Duckabush Road to connect with the new bridge.

Removal of berms would restore channel migration and improve the salmon habitat, Elsen said.

“Taking care of the river channel would alleviate a great deal of flooding that occurs every year,” said Commissioner Kathleen Kler, whose district encompasses the area.

“The bridge also needs major work, but the cost of rerouting traffic will be significant.”

Since the project is in the early planning stage, an accurate cost cannot be determined, Elsen said, although he estimated it at $58.4 million.

The proposal would not be a county project. The presentation represented a courtesy call to inform the county of the plans, County Administrator Philip Morley said.

The Hood Canal Salmon Enhancement Group is working with the state Department of Fish and Wildlife to create a feasibility study, Elsen said.

It began this spring with an identification of key stakeholders, conducting interviews and creating materials that address their concerns about the process.

The study, which Elsen said will cost about $100,000, is scheduled for completion in summer 2017.

After that, a decision will be made on whether to proceed with the project.

Outreach would include shellfish stakeholders to determine shellfish ownership and resources within the estuary, according to the presentation.

The source of funds for the proposal has yet to be determined, Elsen said.

Brinnon resident Joy Baisch said the study and the project were overpriced and unnecessary.

“They are looking for $58 million to reclaim just 30 acres of land,” she said.

“Are they kidding? Where are they going to find that money?”

Baisch predicted the project would gather opposition from tribes and the federal highway department, which could resist the idea to move the road.

Elsen said the details are yet to come.

“We will be working with the state to find potential funding for this,” he said.

“Right now we are gathering input. There is no hurry to get this done.”

_________

Jefferson County Editor Charlie Bermant can be reached at 360-385-2335 or cbermant@peninsuladailynews.com.

More in News

Chimacum Creek early education program could see cuts this year

Governor’s budget says reducing slots could save state $19.5 million

Port Angeles turns off its license plate-reading cameras

City waiting for state legislation on issue

4PA volunteers Kathy and Vern Daugaard pick up litter on the edge of the Tumwater Truck Route this week. 4PA is a nonprofit organization dedicated to a clean and safe community. The efforts of staff and volunteers have resulted in the Touchstone Campus Project, which is being constructed in the 200 block of East First Street, with transitional housing for Port Angeles’ most vulnerable residents. Those interested in volunteering or donating can visit 4PA.org. (Dave Logan/for Peninsula Daily News)
Volunteer work

4PA volunteers Kathy and Vern Daugaard pick up litter on the edge… Continue reading

x
Home Fund proposals now accepted at Olympic View Community Foundation

Requests due March 13 from Peninsula nonprofits

Robin Presnelli, known to many as Robin Tweter, poses shortly before her heart transplant surgery.
Transplant recipient to speak at luncheon

With a new heart, Presnelli now helps others on same path

Northwest School of Wooden Boatbuilding Board President Richard Schwarz gets a rundown of the systems installed in a lobster boat built on campus by Iain Rainey, a recent graduate and current Marine Systems Prothero intern. (Northwest School of Wooden Boatbuilding)
Port Hadlock boatbuilding school sees leadership shift

Organization welcomes interim director as well as new board members

Joey Belanger, the YMCA’s vice president for operations, left, and Ryan Amiot, the executive director of Shore Aquatic Center, celebrate the joint membership pilot option now available between the two organizations.
Joint membership pilot program launched

The Olympic Peninsula YMCA and Shore Aquatic Center have… Continue reading

Mark Gregson.
Interim hospital CEO praises partnership, legacy

Gregson says goal is to solidify pact with UW Medicine in coming months

Jefferson County Auditor Brenda Huntingford, right, watches as clerk Ronnie Swafford loads a stack of ballots that were delivered from the post office on Tuesday into a machine that checks for signatures. The special election has measures affecting the Port Townsend and Brinnon school districts as well as East Jefferson Fire Rescue. (Steve Mullensky/for Peninsula Daily News)
Jefferson County voters supporting school district measures, fire lid lifts

Port Townsend approving 20-year, $99.25 million construction bond

Port of Port Townsend Harbormaster Kristian Ferrero, right, watches as a crew from Seattle Global Diving and Salvage work to remove a derelict catamaran that was stuck in the sand for weeks on a beach at the Water Front Inn on Washington Street in Port Townsend. The boat had been sunk off of Indian Point for weeks before a series of storms pushed it to this beach last week. (Steve Mullensky/for Peninsula Daily News)
Derelict boat removal

Port of Port Townsend Harbormaster Kristian Ferrero, right, watches as a crew… Continue reading

Rob Birman has served as Centrum’s executive director for 14 years. When the arts nonprofit completes its search for its next leader, Birman will transition into a role focused on capital fundraising and overseeing capital projects for buildings Centrum oversees. (Centrum)
Centrum signs lease to remain at Fort Worden for next 35 years

Executive director will transition into role focused on fundraising

Clallam approves contracts with several agencies

Funding for reimbursement, equipment replacement