A mechanical failure of the the Hood Canal Bridge left the span's deck unevenly positioned Sunday. (Washington State Department of Transportation)

A mechanical failure of the the Hood Canal Bridge left the span's deck unevenly positioned Sunday. (Washington State Department of Transportation)

3RD UPDATE: Hood Canal Bridge shut to traffic for much of Sunday by malfunction

SHINE — The Hood Canal Bridge was closed for nearly seven hours Sunday after a mechanical malfunction that morning knocked the lift span out of alignment, a spokesperson for the state Department of Transportation said.

The lift span came out of alignment during a marine traffic opening at 8 a.m. Sunday.

The bridge reopened just before 3 p.m.

The lift span usually opens 600 feet, but only opened 300 feet because of the mechanical problem. The boat crossing under the bridge was still able to get to the other side.

“They stopped moving [the lift span] altogether when they realized it wasn’t opening up level like it was supposed to,” said Cara Mitchell, Department of Transportation spokesperson.

“To reduce any further damage to the bridge, they stopped it right then and there.”

Engineers are now working to determine if there was any damage and its possible extent.

They are also working to determine the exact source of the problem.

At about 2:40 p.m., bridge engineers had lowered the lift span back into its lower position by disassembling a guide on the bridge.

They then reinstalled the guide and inspected the bridge before reopening it to traffic.

“We’ve never had something like this happen in recent years,” Mitchell said.

Because the problem had yet to be identified, Mitchell said she didn’t know if this problem could occur again.

Because of the urgency of the malfunction, the State Patrol offered to escort two additional engineers from Olympia to the bridge if they were facing traffic.

It takes two staff members to open the bridge during a normal opening, she said.

While Transportation wasn’t sure exactly what caused the problem, Mitchell said staff are trained in responding to similar situations.

“We’ve [trained] within the last year,” she said.

“The crews are trained on how to respond to a situation like this, but this is the first time any of us can remember actually having to implement it.”

Transportation crews were working Sunday afternoon to remove electronic sign boards that said the bridge was out.

She said the signs couldn’t be turned off remotely, so it would take about an hour before they were all off.

“We appreciate everyone’s patience while we wrap things up,” she said.

Mitchell said the bridge will continue to open to marine traffic, but only up to 300 feet until engineers get a closer look at the bridge, she said.

If a vessel needs for the bridge to open higher, Transportation will take it on a case-by-case basis, she said.

________

Reporter Jesse Major can be reached at 360-452-2345, ext. 56250, or at jmajor@peninsuladailynews.com.

More in News

Tom Malone of Port Townsend, seeks the warmth of a towel and a shirt as he leaves the 46-degree waters of the Salish Sea on Saturday after he took a cold plunge to celebrate the winter solstice. “You can’t feel the same after doing this as you did before,” Malone said. (Steve Mullensky/for Peninsula Daily News)
Solstice plunge

Tom Malone of Port Townsend, seeks the warmth of a towel and… Continue reading

Tribe, Commerce sign new agreement

Deal to streamline grant process, official says

Jefferson Healthcare to acquire clinic

Partnership likely to increase service capacity

Joe McDonald, from Fort Worth, Texas, purchases a bag of Brussels sprouts from Red Dog Farm on Saturday, the last day of the Port Townsend Farmers Market in Uptown Port Townsend. The market will resume operations on the first Saturday in April 2026. (Steve Mullensky/for Peninsula Daily News)
End of season

Joe McDonald of Fort Worth, Texas, purchases a bag of Brussels sprouts… Continue reading

Clallam requests new court contracts

Sequim, PA to explore six-month agreements

Joshua and Cindy Sylvester’s brood includes five biological sons, two of whom are grown, a teen girl who needed a home, a 9-year-old whom they adopted through the Indian Child Welfare Act, and two younger children who came to them through kinship foster care. The couple asked that the teen girl and three younger children not be fully named. Shown from left to right are Azuriah Sylvester, Zishe Sylvester, Taylor S., “H” Sylvester, Joshua Sylvester (holding family dog Queso), “R,” Cindy Sylvester, Phin Sylvester, and “O.” (Cindy Sylvester)
Olympic Angels staff, volunteers provide help for foster families

Organization supports community through Love Box, Dare to Dream programs

Sequim City Council member Vicki Lowe participates in her last meeting on Dec. 8 after choosing not to run for a second term. (Barbara Hanna/City of Sequim)
Lowe honored for Sequim City Council service

Elected officials recall her inspiration, confidence

No flight operations scheduled this week

There will be no field carrier landing practice operations for… Continue reading

Art Director Aviela Maynard quality checks a mushroom glow puzzle. (Beckett Pintair)
Port Townsend puzzle-maker produces wide range

Christmas, art-history and niche puzzles all made from wood

Food programs updating services

Report: Peninsula sees need more than those statewide

U.S. Rep. Emily Randall, D-Port Orchard.
Randall bill to support military families passes both chambers

ANCHOR legislation would require 45-day relocation notification