Port Townsend Public Works Director Steve King, left, discusses ways to repair the broken sewer line that developed a sinkhole late Friday night on Water Street at the entrance to the Port Townsend ferry dock, with Talon Cameron of Seaton Construction, Lane Dodson and Adam Fructas.
Raw sewage continues to flow through the 70-year-old pipe and partially fills the hole. Plans were to make a temporary fix with a steel plate over the hole until more permanent repairs could be made.