Black Ball Ferry Line is replacing the pilings on both sides of the slip that the MV Coho uses. The old pilings, which date to 1979, had deteriorated and needed to be replaced. The project will be completed before the Coho returns from its annual dry dock and engine maintenance in Anacortes. The ferry will resume its regular winter schedule on Feb. 19.