Pipe installation
Published 1:30 am Wednesday, October 23, 2024
Workers guide a new 125-foot-long, 1,500-pound section of stormwater drain pipe into a trench above the Larry Scott Trail on Tuesday in Port Townsend. The new pipe is bigger and made from a different material than the PVC that it replaced. Last winter, the old pipe fractured in places due to weather and caused dirt and rocks to slide onto the trail.
