Hood Canal Bridge closures this week

SHINE — Traffic delays on the Hood Canal Bridge are expected between 9 a.m. and 3 p.m. Monday through Friday.

It will be the second week for the delays prompted by an inspection of the bridge.

The inspection will require multiple weekday drawspan openings that will close the bridge to vehicular traffic, the state Department of Transportation said.

Drivers are advised to expect delays ranging from 15 minutes to 60 minutes. The length of time the drawspan operations delay traffic will vary depending on the requirements of each individual test being performed on the bridge’s operating systems, DOT said.

The Hood Canal Bridge will undergo a required blue ribbon inspection that includes an overall assessment of the bridge’s mechanical, hydraulic and electrical systems. All DOT floating bridges undergo similar inspections, the department said.

The inspections occur during daylight hours so inspectors can see inside tight spaces and get detailed observations of bridge components and operations.

Hood Canal Bridge text messages are available by sending a text message to 468311 with the words “wsdot hood.”

More in News

Sue Ridder and husband Johnny from Vancouver, visiting relatives in Port Townsend, start cleaning some of the 13 Dungeness crab they caught in Port Townsend Bay on Wednesday. (Steve Mullensky/for Peninsula Daily News)
Catch of the day

Sue Ridder and husband Johnny from Vancouver, visiting relatives in Port Townsend,… Continue reading

Clallam housing waiting lists long

Report: Increase in homeless over 55

Clallam, Jefferson counties each receive park maintenance grants

State funding will go toward repair, upgrade at several local parks

Traffic disruption set at Discovery Bay

Traffic disruption is planned on U.S. Highway 101 at… Continue reading

Jon Picker, airport and marina manager for the Port of Port Angeles, describes runway sections for William R. Fairchild International Airport on a diagram of the terminal area. (Keith Thorpe/Peninsula Daily News)
Fairchild upgrades completed

Ribbon cutting is planned for Dec. 12

Clallam County eyes changes to park fees

Public hearing on adjustments set Dec. 12

Rich Foutch of Active Construction, Inc., in Tacoma paints a line on the roadway at the new roundabout at Kearney Street and state Highway 20 for the placement of temporary stripes in a pedestrian crosswalk on Monday in Port Townsend. The temperatures have to be in the mid-50s to install permanent striping, he said. (Steve Mullensky/for Peninsula Daily News)
Roundabout striping

Rich Foutch of Active Construction, Inc., in Tacoma paints a line on… Continue reading

Proposal to rename Sequim road put on hold

Rotary, city to consider other options to honor local Olympian

Researcher: Managed forests needed to fight climate change

Wood products can replace existing fossil fuel-based materials

Jefferson County updates fee schedules

Environmental Public Health up 6 percent

The downtown Port Angeles Christmas tree is surrounded by people during a lighting ceremony on Saturday at First and Lincoln streets. The 30-foot tree will stand at the Conrad Dyar Memorial Fountain plaza through the holidays. (Keith Thorpe/Peninsula Daily News)
Lit up for the holidays

The downtown Port Angeles Christmas tree is surrounded by people during a… Continue reading

tsr
Community Aid seeks support for Toys for Sequim Kids

Nonprofit helps hundreds of children with Christmas presents