Spectators cheer as crew strains to move floating home into Port Townsend Bay

PORT TOWNSEND — The launch of a two-story floating home, the first built by Port Townsend’s Little & Little Construction, became a major spectator event Tuesday night as the crew of Monroe House Moving struggled to get the 400,000-pound structure more than 20 feet toward the shore of Port Townsend Bay at low tide.

Work to wench and push the building, destined for Lake Union in Seattle, into the bay using a heavy-duty crane truck and small tractors was suspended at about 8 p.m. Tuesday until later Wednesday afternoon so the structure’s launch could be timed with the outgoing tide.

About 100 people, from babies to seniors, came and went during the slow-moving process, some cheering as progress was made.

The floating home needs to be pulled far enough into the bay’s mud flat so it can float once the tide rises, said Bob Little, president of Little & Little Construction.

Little said that once in the bay, the home will be floated to the Port of Port Townsend’s Point Hudson Marina, where it will be moored for a week’s worth of finish work.

“Then we’ll just wait for the right conditions to take it to Lake Union,” Little said Tuesday before the attempted launch.

Little waited aboard the home, where he periodically stepped out of the second-floor door to observe and take photos.

Little said his company has already accepted a contract to build a second floating home at the shipyard.

The home’s design will be modified somewhat so Little can use the Port of Port Townsend’s 300-ton marine lift to launch it, he said.

Jeff Monroe, owner of the third-generation family house-moving business based in Carlsborg and formerly of Quilcene, orchestrated his crew, which managed to wench the home on steel beams that have 48 tire wheels attached, 24 on each side of the structure.

The system gives it the stability to roll down a slight incline of sandy, driftwood-filled shore at the edge of the Port of Port Townsend shipyard, where the three-bedroom home was built.

The crew installed wooden blocks to support steel rails upon which the floating home could roll down to the water’s edge.

The home was designed by Seattle architect Barry Burgess and will be towed to Lake Union, where a family who outgrew its other boathouse will take residence in the new home.

The family, which has a home in Port Townsend, contracted with Little to build the floating home.

Like other floating homes, the building is pre-plumbed and wired for hookup at the dock.

The home’s launch may remind some Port Townsend boat yard old-timers of the launch of the Evviva, a 161-foot yacht built in 1993 before the Port of Port Townsend acquired its 300-ton marine lift to serve the yard.

At least one old-timer remembers Monroe saving the day by coming in to help launch the Evviva after another crew gave up.

Monroe, owner of Monroe House Moving in Carlsborg, originally based out of Quilcene, teamed up with D.B. Davis House Moving of Everett to move the floating home into the water.

Davis provided the specially engineered moving roller system installed under the home to move it into the bay.

________

Sequim-Dungeness Valley Editor Jeff Chew can be reached at 360-681-2391 or at jeff.chew@peninsuladailynews.com.

More in News

Electronics recycling event set for Saturday

The Port Angeles Noon Rotary will host an electronics… Continue reading

Lane closure set Wednesday for art installation

The southbound lane of Race Street in Port Angeles… Continue reading

Beachgoers look for a spot on the sand on Sunday afternoon at Fort Worden State Park in Port Townsend. Mount Rainier looms in the distance. (Steve Mullensky/for Peninsula Daily News)
Summer sand

Beachgoers look for a spot on the sand on Sunday afternoon at… Continue reading

First Fed accused in Ponzi scheme

Resignations came amid $107M lawsuit

Ballots for Aug. 5 primary election to be mailed today

Hospital commission, Port Angeles, Port Townsend city council races to be determined

Port Angeles to host forum on Rayonier cleanup

Special meeting scheduled for Tuesday

Drought conditions may require trucks to bring water to West End

Clallam Bay/Seiku and Island View water systems are under stage… Continue reading

Clallam County Democrats to host candidate forums

The Clallam County Democrats will host a series of… Continue reading

Firefighters work to contain a wildland fire on Tuesday afternoon near Brinnon. “Go now” evacuation orders were given from Jefferson County’s Emergency Operations Center. (Jefferson County Sheriff’s Office)
Evacuation orders given in Brinnon-area fire

Several areas near Brinnon were being asked to evacuate due… Continue reading

Kennedy Reynolds, 2, takes a look at a row of lavender plants with her mother, Chelsea Reynolds of Port Angeles, during a Saturday outing to B & B Family Lavender Farm west of Sequim. The farm will be a participant in this weekend’s Lavender Weekend, a celebration of all things lavender in Sequim and across the Dungeness Valley. (Keith Thorpe/Peninsula Daily News)
Fields of lavender

Kennedy Reynolds, 2, takes a look at a row of lavender plants… Continue reading

Burn ban ordered due to forecast

Peninsula expecting temperatures near 90