Grant Street students asked to tell dreams for a new school; Port Townsend School Board to consider $40.9 million bond request today

PORT TOWNSEND — Grant Street Elementary School students will have input into the construction of a new building, according to the school’s principal.

“It’s going to be their school,” said Lisa Condran, who is in her first year at the helm of the school.

“They have a vision about what a new school can do for them and their education.”

The Port Townsend School District is considering placing a $40.9 million bond issue on the Feb. 9 ballot — $28 million of which would be earmarked for the construction of a new school to be located on what is now the school’s athletic field.

The new school would replace a structure built in 1956. Retrofitting the old school is not an option, according to district Superintendent David Engle, who said it would cost less to build a new school than to repair the old building.

The School Board will consider approving the ballot measure at a meeting at 6 p.m. today in the Gael Stuart Building, 1630 Blaine St.

The new school comprises the majority of the requested bond amount. The rest would go toward retrofitting Port Townsend High School for disabled access.

Tentative plans for the new school feature an interior courtyard accessible by all the classrooms, a library that frames the entrance to the courtyard by forming a bridge between two school wings and a layout designed to bring natural light into the building, Engle said.

Condran said that a representative of Integrus Architecture of Seattle, which has done preliminary designs, met with students on Nov. 4 in the school’s gym.

The students rolled out butcher paper and drew what they wanted in the new school.

Those drawings now decorate the school’s front hall.

The construction would come with a reorganization of grades.

Grant Street, which now houses students in preschool through the third grade, would add the fourth and fifth grades.

Blue Heron Middle School would lose the fourth and fifth grades and adopt the traditional middle school configuration of sixth, seventh and eighth grades.

For that reason, students now in kindergarten, first and second grades participated in the Nov. 4 exercise because they would attend the new school if it opens, as hoped, for the 2018 school year.

Some of the student recommendations will be incorporated in the design, while others had already been thought of and placed in the proposal, Condran said.

“They are including new things they would like to see but also things they have now that they want to hang on to,” Condran said.

For instance, the students want to keep their garden and a library. Both would be expanded if the new school is built.

Many wish-list items are practical and even obvious, such as the library, a play area and a cafeteria.

Ones that probably will not make the cut include a candy store with free jelly beans and a swimming pool, the former for common sense reasons and the latter because students currently are given swimming lessons at Mountain View Pool, Condran said.

The Grant Street school now serves about 450 students in the core program, a special needs program and preschool.

If voters approve the funding, the construction would take place while students occupy the current facility.

Once the new school opened, the old one would be demolished.

Bond measures require 60 percent plus one vote for approval.

If voters approve the measure, the property tax levy would begin in 2017.

A fact sheet in today’s agenda packet says that a levy rate of $1.24 per $1,000 assessed property value would be expected to be required for 20 years to finance the bond.

But since property owners now are paying a levy of 54 cents per $1,000 assessed value for a capital improvements levy that will be retired in 2016, the proposal would raise the levy by 70 cents per $1,000 assessed value.

Taking that into consideration, approval of the bond measure would mean that the annual property tax for a $150,000 property would increase by $105, the school district said.

To view the draft plan go to http://tinyurl.com/PDN-new-school.

________

Jefferson County Editor Charlie Bermant can be reached at 360-385-2335 or cbermant@peninsuladailynews.com.

More in News

Lower Elwha Klallm Tribal Chairwoman Frances Charles, left, speaks about the Paddle to Elwha 2025 canoe journey as Carmen Watson-Charles, the tribe’s cultural manager, holds an informational pamphlet during a presentation to the Port Angeles Chamber of Commerce on Wednesday. (Keith Thorpe/Peninsula Daily News)
Thousands expected for canoe journey this month

Tribe anticipates speeches, songs and traditional dance

Glass recycling returns to Jeffco

Port Townsend, Quilcene locations available

Port of Port Townsend OKs update to its strategic plan

Commissioners discuss economic development

Reservoir project to start this weekend

Lower water pressure expected through Aug. 1

Forks institutes voluntary water conservation measures

The city of Forks is requesting residents to follow voluntary… Continue reading

Resurfacing project begins on Priest Road

Work crews contracted by the city of Sequim have begun… Continue reading

Mandy Miller of Port Angeles and other members of her family spent some time over the Fourth of July weekend picking eight pounds of strawberries at the Graysmarsh Farms north of Sequim. Raspberries will soon though reach their peak picking season, and both are available at Graysmarsh. (Dave Logan/for Peninsula Daily News)
Berry picking

Mandy Miller of Port Angeles and other members of her family spent… Continue reading

Peninsula counties awarded $5M in grants

Funding to cover easements, equipment

Port of Port Angeles to forge ahead with terminal upgrade plans

Design phase would help envision future opportunities

The Northwest Watershed Institute purchased 81 acres for conservation and stewardship in the Tarboo Valley for inclusion in its 500-acre Tarboo Wildlife Preserve. (John Gussman)
Tarboo valley land set aside for preservation

Nearly 500 acres now part of wildlife preserve

Emily Simmons of Port Angeles, a member of the Surfriders Foundation, collects fireworks debris from along Ediz Hook Road in Port Angeles on Saturday. Although fireworks have been banned in the city of Port Angeles, many people used them illegally, leaving behind trash and spent casings and tasking volunteers to pick up the remains. A group from 4PA performed similar cleanup duty on another portion of the hook. (Keith Thorpe/Peninsula Daily News)
Cleanup efforts

Emily Simmons of Port Angeles, a member of the Surfriders Foundation, collects… Continue reading

Stage 3 water alert issued for Clallam Bay system

Clallam County Public Utility District No. 1 has declared a… Continue reading