Construction workers stand on what remains of the old U.S. Highway 101 bridge over the Elwha River on Wednesday as the aging structure is dismantled. The old bridge, built in 1926, was in danger of washout when the river beneath changed course and engineers discovered the bridge piers were built on gravel instead of bedrock, leading to construction of a new bridge, at right, which was opened to traffic in 2024. The old bridge was to remain in place until a fish-spawning window, which runs from mid-July until the end of August.